Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8754546

- Product Categories
- Friendly Links
Information Name: | Note when the supply dryer installation |
Published: | 2012-06-07 |
Validity: | 300 |
Specifications: | |
Quantity: | 10000.00 |
Price Description: | |
Detailed Product Description: | The installation [url = http://www.cnhxjq.com dryer [/ url] Be sure to check the good to be installed, to install backup equipment, so as to in the installation does not appear any other questions later use, not because of maintenance after the initial installation of the errors resulted in inconvenience and so on. Only a installed the equipment in order to of the dryer let us do not have then the and more the trouble of of the in the the later the process of using in the, thereby enhancing the the we the the production of-effectiveness of, and to reduce unnecessary losses. Install the main check the foundation concrete pouring quality and size of the position error: the appearance required on the basis of the surface is clean and free of grease, dust, debris, non-reinforced bare, no crack chipping, and is expected to stay in the hole no residual shell plate, and other casting defects . [Url = http://www.hxhongganji.com] drying machine [/ url] For the basic dimensions and position of deviation should be consistent with the following requirements: Overall dimension and foundation coordinates of the location, the the error of the vertical and horizontal the axis of is less than 20mm. Different plane elevation error small 20mm, allows only negative is not allowed are; total length of the gradient error is less than 20mm, the discharge end to allow do not allow positive; on the planar flatness of less than 5mm / m, total length less than 10mm equipment acceptance control equipment installed packing list, inventory of parts, components, standard parts, random files, etc. to check for the wrong hair missing, deformation damage, etc., and recorded in order to purchase or preparation prior to installation. Clear packaging coating protective coating as well as dust, grease, corrosion, check the dressing in the transport loading and unloading process caused by damage to the deformation. Parts, the key tie, pre-testing and pre-assembled in order to avoid rework the installation work to ensure the progress of the installation and installation quality. w article the source Hongxing dryer net http://www.hxhongganji.com (reproduced please specify source) http://www.hxhongganji.com/product1.htm http://www.hxhongganji.com/pro72.htm http://www.hxhongganji.com/pro68.htm http://www.hxhongganji.com/pro71.htm |
Admin>>>
You are the 13477 visitor
Copyright © GuangDong ICP No. 10089450, Henan Hongxing Mining Machinery Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 13477 visitor
Copyright © GuangDong ICP No. 10089450, Henan Hongxing Mining Machinery Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility